Sorry, you need to enable JavaScript to visit this website.

Weekly traffic update

Sunday, March 10, 2019

Projects affecting San Marcos

traffic March 10 - 16

Online : sanmarcostx.gov/traffic

EAST SAN ANTONIO STREET: Every Saturday from 8 a.m. to 3 p.m. Half a block of the street closed from the Alley to N. LBJ for the Farmers Market on the Square. Main Street Program, 512-393-8430.

THORPE LANE: The 1300 BLK of Thorpe Lane will be closed March 1 - 31, 2019, from 7 a.m. to 6 p.m. for Construction - KBR Builders Inc.

SH 123: SH 123 from Wonder World Drive will have a single lane closure on SH 123 from Wonder World Drive to Clovis Barker heading south on March 12, from 9 a.m. to 3 p.m. Jesse Serna - TXDOT.

LONG TERM ROAD PROJECTS:

HUTCHINSON STREET: Hutchinson Street between Guadalupe Street and Fredericksburg Street will be closed March 13, 2019, from 8 a.m. to 5 p.m. for Electric Utility Installation – Don Alcala – 512.393.8307

VERAMENDI STREET: Veramendi Street will be closed through May 15, from 7 a.m. to 5 p.m. for Utility Installation – Diego Ratchford – 512-470-3325.

CM ALLEN: One lane northbound in the 100 block of CM Allen will be closed until March 22, from 8 a.m. to 5 p.m. for Sidewalk Construction - Shawn Wolfshohl - 512-393-8019.

RAILROAD STREET: Railroad Street between Eisenhower and Gomez Street will be closed until March 31, 2019, from 7 a.m. to 5 p.m. for Utility Installation – Cox Commercial Construction – 956-601-1645.

PATTON STREET: Patton Street between Roosevelt and Wavell Street will be closed starting until March 31, from 7 a.m. to 5 p.m. for Utility Installation – Cox Commercial Construction – 956-601-1645.

MILL STREET RECONSTRUCTION: Mill Street between 500 and 700 blocks will have partial lane closure through the fall for the reconstruction of waterline services and potholing. City of San Marcos Engineering/ CIP Dept. 512-393-8130; Smith Contracting – 512-789-5441.

CHEATHAM STREET: Cheatham Street and the 400-500 Blocks of Guadalupe will have partial lane closures through July for new construction. Gary Bellomy Cheatham Street, L.P. 512-694-8839.

SESSOM DRIVE: Sessom Drive from Aquarena Springs to ED J L Green will be closed starting until March 31, from 7 a.m. to 3 p.m. for Waterline Installation – PROTA Construction – Kermith Garcia – 512-535-2555.

ARMSTRONG STREET: The 100-400 blocks of Armstrong will have partial lane closures until March 31, from 7 a.m. to 5 p.m. for Utility Installation – Cox Commercial Construction – Darren – 956-601-1645.

ROOSEVELT STREET: Roosevelt Street from Eisenhower Street/Patton Street will have partial lane closures with flagger control until March 31, from 7 a.m. to 5 p.m. for Wastewater line construction – Cox Commercial Construction 956-601-1645.

ALABAMA STREET: 500-800 Block of Alabama Street will have lane closure with flagger control until March 31, from 7 a.m. to 5 p.m. for Wastewater line construction – Cox Commercial Construction 956-601-1645.

COERS STREET: Coers Street between Old RR 12 to Owens Street will have southbound lane closure to through traffic untilApril 30, from 7 a.m. to 5:30 p.m. for drainage improvement – Denbow Company – 512-264-2767.

NORTH BISHOP STREET: Westbound Bishop Street between Belvin Street and Prospect Street will be closed until March 30, from 7 a.m. to 6 p.m. for a New Sidewalk Installation – Winters Construction – Charlie Winters – 210-224-7920.

CM ALLEN: CM Allen between University Drive and Hopkins Street will be closed until April for the Reconstruction of the Roadway. City of San Marcos Engineering/ CIP Dept. 512-393-8130.

CONCHO STREET: Eastbound Conch Street between LBJ and Guadalupe will be closed, LBJ and Guadalupe will also have narrow lanes between University Drive and Conch Street, until the summer of 2020. 3411 Builders, Inc. – Richard Bagby- 832-449-0328.

STUDENT CENTER DRIVE: Student Center Drive from Matthews to the North Loading Dock of the Alkek Library will be closed until Jan. 31, 2020.

San Marcos Record

(512) 392-2458
P.O. Box 1109, San Marcos, TX 78666