Sorry, you need to enable JavaScript to visit this website.
Article Image Alt Text

Weekly Traffic Update

Projects affecting San Marcos traffic April 20 - 27
Sunday, April 21, 2019
  • EAST SAN ANTONIO STREET: Every Saturday from 8 a.m. to 3 p.m. Half a block of the street closed from the Alley to N. LBJ for the Farmers Market on the Square. Main Street Program, 512-393-8430.
  • LONG TERM ROAD PROJECTS:
  • BROWN STREET: Brown Street between Prospect Street and Belvin Street will be closed through May 20, from 7 a.m. to 5 p.m. for Utility installation – Jacob Snyder – 214-298-4578.
  • TRAVIS STREET DRAINAGE PROJECT: Traffic impacts include the intersection of MLK at Armstead, Armstead from MLK to San Antonio Street, San Antonio Street from Travis Street to Armstead and Travis Street from San Antonio St. to Hopkins Street will be closed through November, from 7 a.m. to 5. p.m. for Utility Installation – Darren Okruhlik - Cox Commercial Construction – 956-601-1645.
  • RAILROAD STREET: Railroad Street between Eisenhower and Gomez Street will be closed starting through April 30, from 7 a.m. to 5 p.m. for Utility Installation – Cox Commercial Construction – 956-601-1645.
  • MILL STREET RECONSTRUCTION: Mill Street between 500 and 700 blocks will have partial lane closure through the fall of 2019, for the reconstruction of waterline services and potholing. City of San Marcos Engineering/ CIP Dept. 512.393.8130; Smith Contracting – 512-789-5441.
  • CHEATHAM STREET: Cheatham Street and the 400-500 Blocks of Guadalupe will have partial lane closures through July 2019 for new construction. Gary Bellomy Cheatham Street, L.P. 512-694-8839.
  • HOPKINS STREET: Hopkins Street will be closed through fall of 2020 for a Road Widening Project and Underground Utility Installation – Richard Reynosa - 512-393-8235.
  • ROOSEVELT STREET: Roosevelt Street from Eisenhower Street/Patton Street will have partial lane closures with flagger control through April 30, from 7 a.m. to 5 p.m. for Wastewater line construction – Cox Commercial Construction 956-601-1645.
  • CAMACHO STREET/MACARTHUR STREET: 200 – 300 Block of Camacho Street/MacArthur Street will have lane closure with flagger control through April 30, from 7 a.m. to 5 p.m. for Wastewater line construction – Cox Commercial Construction 956-601-1645.
  • ALABAMA STREET: 500-800 Block of Alabama Street will have lane closure with flagger control through April 30, 2019, from 7 a.m. to 5 p.m. for Wastewater line construction – Cox Commercial Construction 956-601-1645.
  • ARMSTRONG STREET: The 100-400 blocks of Armstrong will have partial lane closures through April 30, from 7 a.m. to 5 p.m. for Utility Installation – Cox Commercial Construction – Darren – 956-601-1645.
  • COERS STREET: Coers Street between Old RR 12 to Owens Street will have southbound lane closure to through traffic through Dec. 1, from 7 a.m. to 5:30 p.m. for drainage improvement – Denbow Company – 512-264-2767.
  • CM ALLEN: CM Allen between University Drive and Hopkins Street will be closed through April for the Reconstruction of the Roadway. City of San Marcos Engineering/ CIP Dept. 512-393-8130.
  • CONCHO STREET: Eastbound Concho Street between LBJ and Guadalupe will be closed, LBJ and Guadalupe will also have narrow lanes between University Drive and Concho Street through the summer of 2020 for Construction. 3411 Builders, Inc. – Richard Bagby- 832-449-0328.
  • STUDENT CENTER DRIVE: Student Center Drive from Matthews to the North Loading Dock of the Alkek Library will be closed until Jan. 31, 2020. For the expansion of the LBJ Student Center. Service and delivery access to Alkek Library and Derrick Hall loading docks will be available, via Russell and Pickard Streets. Texas State University 512-245-2202.

San Marcos Record

(512) 392-2458
P.O. Box 1109, San Marcos, TX 78666