Weekly traffic update

Projects affecting San Marcos traffic March 19 - 25

 N. LBJ: The complete block of N. LBJ from Hopkins to University, will be closed for restriping on Sunday, March 19 at 3 a.m. until Monday morning, March 20. Detour signs will be present. City of San Marcos Engineering/CIP Dept., 512-393-8130

UNION PACIFIC RAILROAD CROSSINGS: On March 12 – 19 from 7 a.m. – 6 p.m. daily, Union Pacific will perform railroad crossing repairs/ maintenance for Centerpoint Rd., W. McCarty Ln., Patton St., S. Guadalupe St., S. LBJ Dr. and C.M. Allen Parkway. Locations will be closed for various hours with detour traffic control devices and signage present. UPRR/Advanced Workzone Services, 918-682-9393

LP 82/AQUARENA SPRINGS: TxDOT introduced a new traffic signal at the intersection of Post/Bobcat Feb. 15. Traffic will be reduced to one lane in each direction and then detour to the new signal for approximately 45 days. TxDOT, 512--393-8130

ALLEN ST: Mill and asphalt overlay will begin on Allen St. from Earle to Clyde St. and Clyde St. from Bishop to Allen St. on March 7 – 31 from 8 a.m. – 5 p.m., daily, weather permitting. City of San Marcos Streets Dept., 512-393-8025

202 E. SAN ANTONIO ST: All lanes in both directions, in front of Sean Patrick’s will be closed for a St. Patrick’s Day event on March 17 from 10 a.m. – 2 a.m. Brian Jeffrey, 512-947-8100

WEST WOODS ST: Portions of West Woods Street will be under construction with alternating lane closures and one way through traffic on Monday March 13 - 20. Flaggers will be present. Vehicles will still be able to access Woods Street Garage and the Alkek Parking Garage during this phase of construction. TS, 512-245-2202

106 CHARLES AUSTIN DRIVE: The east bound lane will be closed for a water tie in project on March 13 – 19 from 7 a.m. – 6 p.m. WPM Construction Services, 512-689-5220

600 BLOCK MCARTHUR/GUADALUPE ST: One lane will be closed for installing utilities from McArthur to Guadalupe St. on March 13 – 31 from 7 a.m. – 6 p.m. daily, weather permitting. Rockin Q Construction, 512-738-6666

313 E. HUTCHISON: One lane at E. Hutchison will be closed for sewer maintenance on March 20 - 26 from 6 a.m. – 6 p.m. daily, weather permitting. EMJ Corp, 423.240.4738

SESSOM DR: Single lane closures from N. LBJ to Peques through April 28, weather permitting, from 7 a.m. to 6 p.m. daily for sidewalk construction. City of San Marcos Engineering/CIP Dept., 512-393-8130

RR 12/CRADDOCK: On south bound RR 12 to Craddock, maintenance work will commence for new water main construction on March 1 – April 27 from 8 a.m. – 5 p.m. daily, weather permitting. South bound traffic will be re-routed to center turn lane. KIVA, 512-295-8900

EAST SAN ANTONIO STREET: Every Saturday from 8 a.m. – 3 p.m.  Half a block of street closed from the alley to N. LBJ for the Farmers Market on the Square. Main Street Program, 512-393-8430

LONG TERM ROAD PROJECTS: 

• N LBJ: From Holland St. to Camaro Way will be closed to through traffic until the summer of 2017. Road closure will occur during daytime construction hours. City contractor will be replacing utility lines in the area. Through traffic including Emergency Vehicles, will be routed around the project limits; please follow the detours. Engineering/Capital Improvements, 512-393-8130

VISTA ST.: All lanes in both directions will be closed from 310 – 312 Vista Street for utility construction until July 31, 2018. Texas State University, 512-245-2202

WOODS ST: A segment of Woods Street between Comanche and North Street will be closed during construction of the new Texas State University Engineering & Science Building until Aug. 2018. Project Manager Scott Rouse, 512-245-2202.

 

 

 

 

San Marcos Daily Record

(512) 392-2458
P.O. Box 1109, San Marcos, TX 78666