Maintenance work will take place at Rio Vista Falls to address instream structures and bank improvements, the City of San Marcos recently announced.
The city said underwater voids and undercuts have formed in the bank and instream structures throughout the Rio Vista Falls area and require maintenance.
“The undercutting of large boulders on some of the banks as well as some of the instream structures had reached a point where they needed to be addressed,” City of San Marcos Senior Engineer Greg Schwarz said. “Due to the heavy usage of the area, the city wanted to perform the maintenance during the off-season when public usage is much less.”







